Included in the price of your hot tub is the delivery,installation & 
        commissioning. We will ensure that before we leave, you know how to look 
        after the spa and we will have dosed the tub with the correct chemicals.
         
            | 
            | 
            | 
            | 
        
         
          | 9:00 ~ The hot tub is delivered 
            on time | 
          9:05 ~ An area has already been 
            prepared for the spa and a protected power supply cable is in place 
           | 
          9:10 ~ The spa is moved into position | 
          9:15 ~ The engineer removes some 
            of the wooden panels to gain access to the electrics | 
        
         
            | 
            | 
            | 
            | 
        
         
          | 9:20 ~ The electrical supply is 
            connected | 
          9:25 ~ The spa is filled using 
            the garden hose | 
          9:30 ~ While the spa is filling, 
            the final connections are made | 
          9:35 ~ The insulation is replaced 
            once all the connections have been made | 
        
         
            | 
            | 
            | 
            | 
        
         
          | 9:45 ~ The spa is now half full, 
            time for a nice cup of tea! | 
          9:50 ~ The control box panel is 
            refitted | 
          10:00 ~ The spa is almost ready 
            now to turn on once full and all panels replaced | 
          10:10 ~ The spa is turned on for 
            the first time | 
        
         
            | 
            | 
            | 
            | 
        
         
          | 10:15 ~ A chemical starter pack 
            is opened | 
          10:20 ~ The customer is shown how 
            to add the correct chemicals to their spa | 
          10:25 ~ The customer is shown how 
            to operate the electronic Touchpad - putting the jets on | 
          10:26 ~ With the air controls open 
            increasing the jet power | 
        
         
            | 
            | 
            | 
            | 
        
         
          | 10:27 ~ The 'Grande Finale' the blower is activated | 
          10:28 ~ The rigid cover is unpacked | 
          10:29 ~ The cover is placed on the spa to retain 
            the heat | 
          10:30 ~ The spa will be hot and ready to use 
            within 8 hours and from then on the spa stays at the programmed preset 
            temperature |